Roads

The Roads Division of the Public Works Department is responsible for maintenance of all Township owned roads, and includes:

  • Asphalt milling and hot mix repaving
  • Catch basin repairs
  • Guide rail repairs and installation
  • Pothole patching
  • Right-of-way tree trimming
  • Road reconstruction and in-house paving
  • Shoulder berming
  • Shoulder weed mowing
  • Sign Repair
  • Snow removal
  • Storm pipe repairs and installation
  • Storm water pond repairs and trimming
  • Street sweeping
  • Tar and chipping of road
  • Weed spraying

Current Projects:

 

2021 Paving

The Township's 2021 Hot Mix Paving Program is scheduled to take place during the month of April. The five areas to be paved as part of this program are: North Pointe, Woodward Estates, Greenridge, Woodlawn, and Fairway Estates. In addition, North Greengate Road will be paved between State Route 130 and Beech Hills Road.

Everglade Road Work

Drainage work is being conducted on Everglade Road, just off of State Route 30. During this work the roadway will be closed between Lopes Lane and Route 30, from about 7am to 2pm weekdays, weather permitting. We thank you for your patience and cooperation. 